United States β€Ί Grid β€Ί Interconnection queues

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in Southeast (non-ISO utilities) (2021 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown5256 MW
Active in queue12.7 GW63 requests
Agreement signed1,908 MW12 requests
Withdrawn12316.3 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

5 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project 295, Gilchrist County
Solar Β· Duke Energy Florida, LLC
74.9 MWOperating Gilchrist, FLSoutheast Sep 20212024
Solar project 422, Manatee County
Solar Β· FPL
74.5 MWOperating Manatee, FLSoutheast May 20212025
Solar project 424C, Madison County
Solar Β· FPL
74.5 MWOperating Madison, FLSoutheast Aug 20212024
Solar project 419A, Bay County
Solar Β· FPL
24.5 MWOperating Bay, FLSoutheast Jan 20212023
Solar project 77
Solar
8.0 MWOperating Southeast Jun 20212022

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)