United States β€Ί Grid β€Ί Interconnection queues

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in Southeast (non-ISO utilities) (2010 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown42,438 MW
Active in queue690 MW1 requests
Agreement signed690 MW1 requests
Withdrawn1811.1 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Vogtle Unit 3
Nuclear
1,158 MWOperating Burke, GASoutheast Mar 20102024
Vogtle Unit 4
Nuclear
1,158 MWOperating Southeast Mar 20102024
Gas project 223, Lowndes County
Gas
122 MWOperating Lowndes, MSSoutheast Apr 2010
Other project 105, Marion County
Other Β· G2 Landfill
0.1 MWOperating Marion, FLSoutheast Apr 20102010

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)