United States βΊ Grid βΊ Interconnection queues βΊ Minnesota
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in Minnesota, SPP
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar project GEN-2024-269, Otter Tail County Solar |
315 MW | Withdrawn / abandoned |
| Solar project GEN-2017-103, Chippewa County Solar |
8.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- MISO (Midcontinent)476 Β· 79.8 GW
- West (non-ISO utilities)4 Β· 405 MW
- SPP (Southwest Power Pool)2 Β· 323 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)