United States β€Ί Grid β€Ί Interconnection queues β€Ί North Carolina

OCTARY USA Β· INTERCONNECTION QUEUES

Queue requests in study in North Carolina, PJM

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown9538 MW
Active in queue1,846 MW22 requests
Agreement signed1,308 MW13 requests
Withdrawn13711.3 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

9 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project AH1-040, Washington County
Solar Β· ACE Development Company, LLC
150 MWIn study Washington, NCPJM Feb 2025target 2025
Solar project AG2-522, Warren County
Solar Β· Horizon Solar East, LLC
80.0 MWIn study Warren, NCPJM Feb 2025target 2025
Edgecome Solar Energy Center
Solar
75.0 MWPaused / redesign Edgecombe, NCPJM Aug 2016target 2025
Solar project AG2-382, Bertie County
Solar Β· Merry Hill PV I, LLC
70.0 MWIn study Bertie, NCPJM Feb 2025target 2024
Sweetleaf Solar
Solar
60.0 MWPaused / redesign Halifax, NCPJM Aug 2017target 2027
Solar project AH1-271, Bertie County
Solar Β· Merry Hill PV I, LLC
40.0 MWIn study Bertie, NCPJM Feb 2025target 2024
Sweetleaf Solar
Solar
33.0 MWPaused / redesign Halifax, NCPJM Aug 2017target 2027
Solar project AH1-033, Currituck County
Solar Β· Sligo Solar, LLC
19.5 MWIn study Currituck, NCPJM Feb 2025target 2024
Solar + storage project AH2-384, Martin County
Solar + storage
10.0 MWIn study Martin, NCPJM Mar 2022target 2026

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)