Interconnection queue in Indiana, PJM (2018 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown5590 MW
Active in queue590 MW5 requests
Agreement signed0.0 MW0 requests
Withdrawn205,361 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

5 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Golden Aster Solar Energy Center
Solar
160 MWPaused / redesign Grant, INPJM Sep 2018target 2026
Meadow Forge Solar Energy Center
Solar
130 MWPaused / redesign Delaware, INPJM Sep 2018target 2026
Headwaters Wind Farm III
Onshore wind
100 MWPaused / redesign Randolph, INPJM Sep 2018target 2026
Madison County Solar
Solar
100 MWPaused / redesign Madison, INPJM Mar 2018target 2025
Headwaters Wind Farm III
Onshore wind
100 MWPaused / redesign Randolph, INPJM Sep 2018target 2026

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)