Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown152,000 MW
Active in queue2,000 MW15 requests
Agreement signed610 MW8 requests
Withdrawn323,188 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

15 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Steward Creek Solar
Solar Β· Steward Creek Solar, LLC
300 MWIn study Lee, ILPJM Dec 2019target 2023
Black Diamond Solar
Solar Β· Black Diamond Solar Power, LLC
299 MWIn study Christian, ILPJM Mar 2019target 2022
South Dixon Solar
Solar Β· Deriva Energy Solar, LLC
200 MWIn study Lee, ILPJM Sep 2019target 2022
Rolling Farms Wind Project
Onshore wind
200 MWAgreement signed Christian, ILPJM Aug 2019target 2029
Gipper Wind Farm
Onshore wind Β· Gipper Wind Farm, LLC
191 MWIn study Whiteside, ILPJM Sep 2019target 2022
Bright Stalk Generating Facility
Onshore wind Β· Lexington Chenoa Wind Farm LLC
150 MWIn study Mclean, ILPJM Mar 2019target 2022
Heritage Prairie Solar
Solar
150 MWAgreement signed Kankakee, ILPJM Mar 2019target 2027
Plano Skies Energy Center
Solar Β· Plano Skies Energy Center, LLC
150 MWIn study Kendall, ILPJM Mar 2019target 2022
Panther Grove 2
Onshore wind
100 MWAgreement signed Woodford, ILPJM Mar 2019target 2027
Plano Skies Energy Center
Solar Β· Plano Skies Energy Center, LLC
100 MWIn study Kendall, ILPJM May 2019target 2022
Zion Energy Center - BESS
Battery storage
50.0 MWAgreement signed Lake, ILPJM Nov 2019target 2027
Panther Grove Wind
Onshore wind
50.0 MWAgreement signed Woodford, ILPJM Mar 2019target 2027
Calumet BESS
Battery storage
20.0 MWAgreement signed Cook, ILPJM Oct 2019target 2027
Rochelle Solar
Solar
20.0 MWAgreement signed Ogle, ILPJM Sep 2019target 2028
Kincaid PV
Solar
20.0 MWAgreement signed Christian, ILPJM Oct 2019target 2028

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)