United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in NYISO (New York) (2013 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Caithness Long Island II Gas Β· Caithness Long Island II, LLC |
632 MW | Withdrawn / abandoned |
| Linden Cogen Uprate Gas Β· East Coast Power LLC |
208 MW | Withdrawn / abandoned |
| Brookfield Wind Energy Onshore wind Β· NextEra Energy Resources, LLC |
100 MW | Withdrawn / abandoned |
| Black Oak Wind Onshore wind Β· Black Oak Wind Farm, LLC |
12.5 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)136 Β· 10.7 GW
- PJM (Mid-Atlantic, Midwest)80 Β· 10.3 GW
- ERCOT (Texas)52 Β· 8,996 MW
- MISO (Midcontinent)42 Β· 7,775 MW
- CAISO (California)47 Β· 7,426 MW
- SPP (Southwest Power Pool)30 Β· 4,501 MW
- Southeast (non-ISO utilities)62 Β· 4,349 MW
- NYISO (New York)4 Β· 953 MW
- ISO-NE (New England)9 Β· 840 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)