OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in NYISO (New York) (2017 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown12598 MW
Active in queue749 MW6 requests
Agreement signed0.0 MW0 requests
Withdrawn612,565 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

12 requests
ProjectCapacityStatusLocationRegionQueuedOnline
South Fork Wind Farm
Onshore wind Β· South Fork Wind, LLC
96.0 MWOperating Suffolk, NYNYISO Feb 2017
South Fork Wind Farm
Offshore wind Β· South Fork Wind, LLC
96.0 MWOperating NYNYISO Feb 2017
High River Solar
Solar Β· High River Energy Center, LLC
90.0 MWOperating NYNYISO Mar 2017
High River Solar
Solar Β· High River Energy Center, LLC
90.0 MWOperating Montgomery, NYNYISO Mar 2017
East Point Solar
Solar Β· East Point Energy Center, LLC
50.0 MWOperating NYNYISO Mar 2017
East Point Solar
Solar Β· East Point Energy Center, LLC
50.0 MWOperating Schoharie, NYNYISO Mar 2017
Calverton Solar Energy Center
Solar Β· LI Solar Generation, LLC
22.9 MWOperating NYNYISO Oct 2017
Calverton Solar Energy Center
Solar Β· LI Solar Generation, LLC
22.9 MWOperating Suffolk, NYNYISO Oct 20172022
Pattersonville
Solar Β· Pattersonville Solar Facility, LLC
20.0 MWOperating NYNYISO Jul 2017
Albany County 2
Solar Β· Hecate Energy Albany 2 LLC
20.0 MWOperating NYNYISO Jan 2017
Albany County 2
Solar Β· Hecate Energy Albany 2 LLC
20.0 MWOperating Albany, NYNYISO Jan 2017
Pattersonville
Solar Β· Pattersonville Solar Facility, LLC
20.0 MWOperating Montgomery, NYNYISO Jul 2017

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)