Interconnection queue in MISO (Midcontinent) (2014 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown2736 MW
Active in queue736 MW2 requests
Agreement signed736 MW2 requests
Withdrawn7722.8 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

2 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project J351, St. Joseph County
Gas
715 MWAgreement signed St. Joseph, INMISO May 2014target 2020
Gas project J384, Dane County
Gas
21.0 MWAgreement signed Dane, WIMISO Aug 2014target 2017

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)