OCTARY USA Β· INTERCONNECTION QUEUES

Queue projects under construction in MISO (Midcontinent) (2020 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown71,085 MW
Active in queue15.7 GW95 requests
Agreement signed5,106 MW32 requests
Withdrawn19527.2 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

7 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Onshore wind project J1781, Iowa County
Onshore wind
300 MWUnder construction Iowa, WIMISO Jun 2020target 2027
Solar project J1559, Conway County
Solar
200 MWUnder construction Conway, ARMISO Jun 2020target 2026
Solar project J1671, Walker County
Solar
150 MWUnder construction Walker, TXMISO Jun 2020target 2025
Solar project J1644, St. Landry Parish County
Solar
150 MWUnder construction St. Landry Parish, LAMISO Jun 2020target 2024
Solar project J1520, Worth County
Solar
135 MWUnder construction Worth, IAMISO Jun 2020target 2027
Battery storage project J1659, Washtenaw County
Battery storage
100 MWUnder construction Washtenaw, MIMISO Jun 2020target 2025
Solar project J1747, Madison County
Solar
50.0 MWUnder construction Madison, MSMISO Jun 2020target 2024

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)