Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown3130 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn2879 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

3 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Coal project G541, Beaver County
Coal
50.0 MWOperating Beaver, PAMISO Sep 20052006
Coal project G543, Beaver County
Coal
50.0 MWOperating Beaver, PAMISO Sep 20052005
Other project J374, Bucks County
Other
30.0 MWOperating Bucks, PAMISO Jul 20142014

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)