πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Missouri

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in Missouri, MISO (2024 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown102,579 MW
Active in queue2,579 MW10 requests
Agreement signed0.0 MW0 requests
Withdrawn142,801 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

10 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Replacing 864 MW of coal with Natural Gas Generators; Castle Bluff
Gas
824 MWIn study St. Louis, MOMISO May 2024target 2025
Battery storage project J3518, Gasconade County
Battery storage
300 MWIn study Gasconade, MOMISO Apr 2024target 2028
Solar project J3758, Macon County
Solar
300 MWIn study Macon, MOMISO Apr 2024target 2028
Battery storage project J3352, Cape Girardeau County
Battery storage
250 MWIn study Cape Girardeau, MOMISO Apr 2024target 2027
Battery storage project J3440, Daviess County
Battery storage
200 MWIn study Daviess, MOMISO Apr 2024target 2028
Solar project J3436, Daviess County
Solar
200 MWIn study Daviess, MOMISO Apr 2024target 2028
Solar project J3442, Scott County
Solar
156 MWIn study Scott, MOMISO Apr 2024target 2028
Battery storage project J3505, Bollinger County
Battery storage
150 MWIn study Bollinger, MOMISO Apr 2024target 2028
Battery storage project J3736, Osage County
Battery storage
100 MWIn study Osage, MOMISO Apr 2024target 2027
Replacing 95 MW of coal with BESS; Meramec 1, 2, 3, 4
Other
98.8 MWIn study St. Louis, MOMISO Dec 2024target 2025

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)