OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in Mississippi, MISO

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown71,088 MW
Active in queue12.8 GW65 requests
Agreement signed402 MW4 requests
Withdrawn13825.0 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

7 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project J1249, Lamar County
Gas
600 MWOperating Lamar, MSMISO Apr 20192022
Solar project J1347, Scott County
Solar
175 MWOperating Scott, MSMISO Apr 20192023
Solar project J830, Madison County
Solar
100 MWOperating Madison, MSMISO Jun 20172021
Solar project J679, Carroll County
Solar
100 MWOperating Carroll, MSMISO Jul 20162021
Solar project J473, Lamar County
Solar
52.0 MWOperating Lamar, MSMISO Sep 20152015
Gas project J477, Hinds County
Gas
36.4 MWOperating Hinds, MSMISO Sep 20152018
Gas project J888, George County
Gas
25.0 MWOperating George, MSMISO Jun 20172019

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)