United States β€Ί Grid β€Ί Interconnection queues β€Ί Kentucky

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in Kentucky, MISO

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown41,675 MW
Active in queue3,706 MW24 requests
Agreement signed400 MW2 requests
Withdrawn529,678 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project G019, Oldham County
Gas
750 MWOperating Oldham, KYMISO Dec 19992004
Coal project G218, Trimble County
Coal
750 MWOperating Trimble, KYMISO Apr 20022006
Hydro project G032, Hancock County
Hydro
95.0 MWOperating Hancock, KYMISO Mar 20002001
Hydro project G848, Livingston County
Hydro
80.0 MWOperating Livingston, KYMISO Sep 20072007

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)