United States β€Ί Grid β€Ί Interconnection queues

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in ISO-NE (New England) (2020 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown4129 MW
Active in queue129 MW4 requests
Agreement signed129 MW4 requests
Withdrawn1139,841 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Warren Meadow Solar
Solar
74.5 MWAgreement signed Knox, MEISO-NE Nov 2020target 2026
BD Solar Church Hill
Solar
20.0 MWAgreement signed Androscoggin, MEISO-NE Feb 2020target 2028
SolarFairfield
Solar
18.1 MWAgreement signed Somerset, MEISO-NE Dec 2020target 2027
Emery Meadow Solar
Solar
16.4 MWAgreement signed York, MEISO-NE Apr 2020target 2027

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)