OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in ISO-NE (New England) (2021 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown5367 MW
Active in queue3,998 MW20 requests
Agreement signed3,473 MW17 requests
Withdrawn858,317 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

5 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Bear Swamp Pumping Load Increase
Battery storage
333 MWOperating Berkshire, MAISO-NE Nov 2021target 2021
Berlin Energy Uprate and Battery Addition
Other
15.0 MWOperating Coos, NHISO-NE Mar 2021target 2023
Rumford Uprate and Battery addition
Other
8.5 MWOperating Oxford, MEISO-NE Mar 2021target 2023
Bonny Eagle Energy Storage - Uprate
Other
8.0 MWOperating York, MEISO-NE Mar 2021target 2023
13665 Felt Road Solar
Solar + storage
2.0 MWOperating Oxford, MEISO-NE Aug 2021target 2024

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)