OCTARY USA Β· INTERCONNECTION QUEUESCompleted queue projects in ISO-NE (New England) (2014 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Cricket Valley Project (QP444 in NYISO Queue) Gas |
1,020 MW | |
| Canal 3 Gas |
333 MW | |
| Medway Peaker - SEMARI Gas |
208 MW | |
| Wallingford Energy Center Gas |
100 MW | |
| Bridgeport Energy Uprate Gas |
84.0 MW | |
| GRE Capacity Uprate Gas |
41.0 MW | |
| Deerfield Wind Project Onshore wind |
30.0 MW | |
| Newington Gas Turbine Uprate Gas |
27.9 MW | |
| Jericho Wind expansion Onshore wind |
3.5 MW | |
| MATEP (Combined Cycle) Increase Gas |
1.7 MW | |
| Glendale Hydroelectric Expansion Project Hydro |
0.2 MW |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- PJM (Mid-Atlantic, Midwest)60 Β· 8,237 MW
- MISO (Midcontinent)34 Β· 6,748 MW
- ERCOT (Texas)21 Β· 3,706 MW
- West (non-ISO utilities)65 Β· 2,635 MW
- NYISO (New York)10 Β· 2,535 MW
- Southeast (non-ISO utilities)10 Β· 2,526 MW
- SPP (Southwest Power Pool)18 Β· 2,031 MW
- ISO-NE (New England)11 Β· 1,849 MW
- CAISO (California)10 Β· 735 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)