United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESCompleted queue projects in ISO-NE (New England) (2011 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| CPV Towantic Energy Center Gas |
745 MW | |
| Altresco Increase (winter) Gas |
193 MW | |
| Passadumkeag Windpark Onshore wind |
40.0 MW | |
| Harrington Street PV Project (QF) Solar |
9.8 MW | |
| Kingdom Community Wind Increase (see Q311) Onshore wind |
3.1 MW | |
| Wyman Hydro Uprate U1 Hydro |
2.5 MW | |
| Skelton Station Modernization Phase 1 Hydro |
1.1 MW | |
| Milford Hydro Expansion Increase (Q358) Hydro |
0.2 MW |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- PJM (Mid-Atlantic, Midwest)59 Β· 5,393 MW
- SPP (Southwest Power Pool)17 Β· 2,604 MW
- ERCOT (Texas)13 Β· 1,768 MW
- MISO (Midcontinent)12 Β· 1,465 MW
- West (non-ISO utilities)43 Β· 1,347 MW
- ISO-NE (New England)8 Β· 994 MW
- CAISO (California)14 Β· 731 MW
- Southeast (non-ISO utilities)4 Β· 125 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)