United States β€Ί Grid β€Ί Interconnection queues

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in CAISO (California) (2011 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown5971 MW
Active in queue971 MW5 requests
Agreement signed971 MW5 requests
Withdrawn18730.0 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

5 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Big SKY Solar
Solar + storage
476 MWAgreement signed Los Angeles, CACAISO Mar 2011target 2023
Wright Solar
Solar + storage
280 MWAgreement signed Merced, CACAISO Mar 2011target 2026
Excelsior Solar (Fka: Burford Five Points)
Solar + storage
120 MWAgreement signed Fresno, CACAISO Mar 20112016
Redwood Solar Farm
Solar
90.0 MWAgreement signed Kern, CACAISO Mar 2011target 2024
Lassen Lodge Hydroelectric
Hydro
4.5 MWAgreement signed Tehama, CACAISO Mar 2011target 2027

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)