πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in CAISO (California) (2018 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown82,157 MW
Active in queue6,790 MW23 requests
Agreement signed5,488 MW19 requests
Withdrawn6721.7 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

8 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Rexford Solar Farm
Solar + storage
540 MWOperating Tulare, CACAISO Apr 20182025
Dallas Energy Storage
Battery storage
500 MWOperating Monterey, CACAISO Apr 20182021
Panoche Energy Center C11
Gas
427 MWOperating Fresno, CACAISO Apr 20182024
Bateria Del Sur
Battery storage
350 MWOperating Imperial, CACAISO Apr 20182025
Quartzite Solar 11
Solar + storage
225 MWOperating Riverside, CACAISO Apr 20182024
Caballero Storage
Battery storage
106 MWOperating San Luis Obispo, CACAISO Apr 20182025
Wind Wall Monolith 1
Onshore wind
5.0 MWOperating CACAISO Apr 20182021
Wind Wall Monolith 2
Onshore wind
3.7 MWOperating Kern, CACAISO Apr 20182021

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)