OCTARY USA Β· INTERCONNECTION QUEUESCompleted queue projects in CAISO (California) (2012 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| California Flats Solar Solar + storage |
340 MW | |
| Pastoria Energy Facility Gas |
50.0 MW | |
| Mojave Solar Solar |
25.0 MW | |
| Wildwood Solar 2 Solar |
15.0 MW | |
| Skic Solar Solar |
10.0 MW |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- PJM (Mid-Atlantic, Midwest)48 Β· 5,899 MW
- ERCOT (Texas)23 Β· 4,354 MW
- West (non-ISO utilities)49 Β· 2,322 MW
- SPP (Southwest Power Pool)17 Β· 1,712 MW
- MISO (Midcontinent)7 Β· 1,087 MW
- NYISO (New York)12 Β· 1,080 MW
- ISO-NE (New England)8 Β· 802 MW
- CAISO (California)5 Β· 440 MW
- Southeast (non-ISO utilities)7 Β· 218 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)