United States β€Ί Grid β€Ί Interconnection queues

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in CAISO (California) (2012 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown5440 MW
Active in queue40.0 MW1 requests
Agreement signed40.0 MW1 requests
Withdrawn6012.3 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

5 requests
ProjectCapacityStatusLocationRegionQueuedOnline
California Flats Solar
Solar + storage
340 MWOperating Monterey, CACAISO Apr 20122019
Pastoria Energy Facility
Gas
50.0 MWOperating Kern, CACAISO Apr 20122016
Mojave Solar
Solar
25.0 MWOperating San Bernardino, CACAISO Apr 20122015
Wildwood Solar 2
Solar
15.0 MWOperating Kern, CACAISO Apr 20122017
Skic Solar
Solar
10.0 MWOperating Kern, CACAISO Apr 20122017

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)