United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESProjects with signed interconnection agreements in CAISO (California) (2016 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Daylight Solar + storage |
611 MW | Agreement signed |
| Daggett Solar 3 Solar + storage |
522 MW | Agreement signed |
| Pluot Solar + storage |
479 MW | Agreement signed |
| Pomegranate Solar + storage |
479 MW | Agreement signed |
| Corby Battery storage |
314 MW | Agreement signed |
| Roccasecca BESS Battery storage |
303 MW | Agreement signed |
| Tahoe Battery storage |
300 MW | Agreement signed |
| Pastoria Solar Solar + storage |
187 MW | Agreement signed |
| Mulqueeney Ranch Wind Onshore wind |
114 MW | Agreement signed |
| Kyan Solar Solar |
102 MW | Agreement signed |
| Solar Star 4 Solar + storage |
50.0 MW | Agreement signed |
| Solar Star 3 Solar + storage |
50.0 MW | Agreement signed |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)22 Β· 4,780 MW
- SPP (Southwest Power Pool)23 Β· 4,085 MW
- CAISO (California)12 Β· 3,510 MW
- PJM (Mid-Atlantic, Midwest)21 Β· 1,820 MW
- ERCOT (Texas)8 Β· 1,297 MW
- MISO (Midcontinent)10 Β· 1,011 MW
- ISO-NE (New England)2 Β· 866 MW
- Southeast (non-ISO utilities)8 Β· 753 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)