United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in Texas (2025 requests) β€” page 9

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown402116.3 GW
Active in queue116.3 GW402 requests
Agreement signed4,428 MW22 requests
Withdrawn164,201 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

402 requests Β· page 9 of 9
ProjectCapacityStatusLocationRegionQueuedOnline
Kickstart Energy Storage I
Battery storage Β· Kickstart Infrastructure LLC
1.4 MWIn study Ellis, TXERCOT Mar 2025target 2029
Kickstart Energy Storage II
Battery storage Β· Kickstart Infrastructure LLC
1.4 MWIn study Ellis, TXERCOT Mar 2025target 2029
Page 9 of 9

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)