Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown37254.6 GW
Active in queue20.9 GW182 requests
Agreement signed2,938 MW37 requests
Withdrawn37254.6 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

372 requests · page 8 of 8
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project 8286, Anson County
Solar
5.0 MWWithdrawn / abandoned Anson, NCSoutheast Oct 2016
Battery storage project 570148, Caldwell County
Battery storage
5.0 MWWithdrawn / abandoned Caldwell, NCSoutheast Jun 2022
Solar project AB2-073, Hertford County
Solar
5.0 MWWithdrawn / abandoned Hertford, NCPJM Apr 2016target 2016
Solar project AB2-186, Perquimans County
Solar
5.0 MWWithdrawn / abandoned Perquimans, NCPJM Apr 2016target 2017
Solar project AB2-087, Hertford County
Solar
5.0 MWWithdrawn / abandoned Hertford, NCPJM Apr 2016target 2016
Solar project AB2-098, Martin County
Solar
5.0 MWWithdrawn / abandoned Martin, NCPJM Apr 2016target 2016
Battery storage project 114704, Wilkes County
Battery storage
4.6 MWWithdrawn / abandoned Wilkes, NCSoutheast Jun 2020
Battery storage project 898287, Randolph County
Battery storage
4.3 MWWithdrawn / abandoned Randolph, NCSoutheast Jun 2023target 2026
Battery storage project 162458, Burke County
Battery storage
4.0 MWWithdrawn / abandoned Burke, NCSoutheast Jul 2021target 2025
Solar project 5596, Pamlico County
Solar
4.0 MWWithdrawn / abandoned Pamlico, NCSoutheast Jun 2016
Solar project AB2-088, Edgecombe County
Solar
4.0 MWWithdrawn / abandoned Edgecombe, NCPJM Apr 2016target 2016
Solar project AB2-018
Solar
3.0 MWWithdrawn / abandoned NCPJM Jan 2016target 2016
Solar project AB2-035, Pitt County
Solar
3.0 MWWithdrawn / abandoned Pitt, NCPJM Feb 2016target 2016
Solar project 957452, Johnston County
Solar
3.0 MWWithdrawn / abandoned Johnston, NCSoutheast Jun 2024
Battery storage project 41456, Mecklenburg County
Battery storage
2.8 MWWithdrawn / abandoned Mecklenburg, NCSoutheast Aug 2019
Battery storage project 562852, Surry County
Battery storage
2.7 MWWithdrawn / abandoned Surry, NCSoutheast Jun 2022
Battery storage project 150372, Surry County
Battery storage
2.2 MWWithdrawn / abandoned Surry, NCSoutheast Jul 2021
Solar project 5037, Columbus County
Solar
2.0 MWWithdrawn / abandoned Columbus, NCSoutheast Apr 2016
Solar project 879901, Guilford County
Solar
1.9 MWWithdrawn / abandoned Guilford, NCSoutheast Jun 2023
Battery storage project 141496, Alamance County
Battery storage
1.0 MWWithdrawn / abandoned Alamance, NCSoutheast Dec 2020
Solar project 901397, Lenoir County
Solar
1.0 MWWithdrawn / abandoned Lenoir, NCSoutheast Jun 2023
Solar project 899257, Bladen County
Solar
1.0 MWWithdrawn / abandoned Bladen, NCSoutheast Jun 2023
Page 8 of 8

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)