United States β€Ί Grid β€Ί Interconnection queues β€Ί North Carolina

SOLAR Β· PJM

Solar project AB2-018

Solar project AB2-018 is a 3.0 MW solar request withdrawn in the PJM interconnection queue, connecting to Dominion.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2016 (completed)
  2. Withdrawn / abandonedFeb 2016 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AB2-018
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
Dominion
Connection point (POI)
Bethel-Carolina 12.kkV
Location
North Carolina
Technology
Solar: 3.0 MW
Total requested
3.0 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
20 January 2016
Proposed online date
December 2016
Withdrawn
February 2016

Location

No county location in the queue data.

Power plants in North Carolina Β· Transmission lines in North Carolina

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem