United States › Grid › Interconnection queues › Louisiana
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in Louisiana — page 7
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar project J862, Orleans Parish County Solar |
20.0 MW | Withdrawn / abandoned |
| Battery storage project J2012, Tangipahoa Parish County Battery storage |
20.0 MW | Withdrawn / abandoned |
| Solar project J687, Orleans Parish County Solar |
20.0 MW | Withdrawn / abandoned |
| Solar project J710, Lafayette Parish County Solar |
20.0 MW | Withdrawn / abandoned |
| Onshore wind project J323, St. Mary Parish County Onshore wind |
19.8 MW | Withdrawn / abandoned |
| Solar project J693, Jefferson Davis Parish County Solar |
16.5 MW | Withdrawn / abandoned |
| Solar project J694, Iberia Parish County Solar |
14.7 MW | Withdrawn / abandoned |
| Gas project GEN-2011-033, Caddo Parish County Gas |
10.8 MW | Withdrawn / abandoned |
| Other project J3765, St. James Parish County Other |
8.0 MW | Withdrawn / abandoned |
| Solar project J692, Allen Parish County Solar |
5.5 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)