United States › Grid › Interconnection queues › Louisiana

OCTARY USA · INTERCONNECTION QUEUES

Withdrawn queue requests in Louisiana — page 7

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown31059.6 GW
Active in queue37.6 GW140 requests
Agreement signed3,056 MW18 requests
Withdrawn31059.6 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

310 requests · page 7 of 7
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project J862, Orleans Parish County
Solar
20.0 MWWithdrawn / abandoned Orleans Parish, LAMISO Jun 2017target 2019
Battery storage project J2012, Tangipahoa Parish County
Battery storage
20.0 MWWithdrawn / abandoned Tangipahoa Parish, LAMISO Nov 2021target 2025
Solar project J687, Orleans Parish County
Solar
20.0 MWWithdrawn / abandoned Orleans Parish, LAMISO Jul 2016target 2019
Solar project J710, Lafayette Parish County
Solar
20.0 MWWithdrawn / abandoned Lafayette Parish, LAMISO Sep 2016target 2018
Onshore wind project J323, St. Mary Parish County
Onshore wind
19.8 MWWithdrawn / abandoned St. Mary Parish, LAMISO Jan 2014
Solar project J693, Jefferson Davis Parish County
Solar
16.5 MWWithdrawn / abandoned Jefferson Davis Parish, LAMISO Jul 2016target 2018
Solar project J694, Iberia Parish County
Solar
14.7 MWWithdrawn / abandoned Iberia Parish, LAMISO Jul 2016target 2018
Gas project GEN-2011-033, Caddo Parish County
Gas
10.8 MWWithdrawn / abandoned Caddo Parish, LASPP Jun 2011target 2013
Other project J3765, St. James Parish County
Other
8.0 MWWithdrawn / abandoned St. James Parish, LAMISO Apr 2024target 2024
Solar project J692, Allen Parish County
Solar
5.5 MWWithdrawn / abandoned Allen Parish, LAMISO Jul 2016target 2018
Page 7 of 7

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)