Interconnection queue in PJM (Mid-Atlantic, Midwest) (2022 requests) β€” page 7

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown30137.9 GW
Active in queue37.9 GW301 requests
Agreement signed0.0 MW0 requests
Withdrawn18219.3 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

301 requests Β· page 7 of 7
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project AI1-160, Crawford County
Solar
1.4 MWIn study Crawford, PAPJM Sep 2022target 2028
Page 7 of 7

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)