🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Arizona

OCTARY USA · INTERCONNECTION QUEUES

Queue requests in study in Arizona — page 6

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown25596.7 GW
Active in queue108.6 GW281 requests
Agreement signed9,849 MW17 requests
Withdrawn699198.8 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

255 requests · page 6 of 6
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project Q65, Maricopa County
Gas
30.0 MWIn study Maricopa, AZWest Nov 2020target 2022
Agua Caliente Solar 2
Solar
20.0 MWIn study Maricopa, AZCAISO Mar 2016target 2016
Gas project Q64, Pinal County
Gas
17.0 MWIn study Pinal, AZWest Jun 2020target 2020
Other project Q602, Maricopa County
Other
10.8 MWIn study Maricopa, AZWest May 2025
Other project Q394, Maricopa County
Other
5.0 MWIn study Maricopa, AZWest Mar 2021target 2021
Page 6 of 6

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)