United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESProjects with signed interconnection agreements in CAISO (California) — page 5
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Sunshine Valley Solar 1 Solar + storage |
90.0 MW | Agreement signed |
| Sand Hill C Onshore wind |
84.3 MW | Agreement signed |
| Gonzaga Wind Farm Onshore wind |
80.0 MW | Agreement signed |
| Montezuma (High Winds III) Wind + storage |
76.0 MW | Agreement signed |
| Hummingbird Energy Storage Battery storage |
75.0 MW | Agreement signed |
| Willow Springs Solar 4 Battery storage |
75.0 MW | Agreement signed |
| Rosemary Solar + storage |
72.3 MW | Agreement signed |
| Fallbrook Energy Storage Battery storage |
69.6 MW | Agreement signed |
| Mulqueeney Ranch Wind 2 Onshore wind |
62.5 MW | Agreement signed |
| Angela Solar + storage |
60.0 MW | Agreement signed |
| Camino Solar Solar + storage |
58.3 MW | Agreement signed |
| Bottle Rock Power Other |
56.9 MW | Agreement signed |
| Orleans Solar + storage |
51.1 MW | Agreement signed |
| Ventasso Energy Storage Battery storage |
50.8 MW | Agreement signed |
| Willow Springs Solar 3 Battery storage |
50.0 MW | Agreement signed |
| Solar Star 4 Solar + storage |
50.0 MW | Agreement signed |
| North Johnson Energy Center Battery storage |
50.0 MW | Agreement signed |
| Chula Vista Energy Center 2 Battery storage |
50.0 MW | Agreement signed |
| Solar Star 3 Solar + storage |
50.0 MW | Agreement signed |
| Ares Nevada Battery storage |
44.0 MW | Agreement signed |
| Little Bear 3 Solar + storage |
40.4 MW | Agreement signed |
| Rio Bravo Solar 1 Solar + storage |
40.0 MW | Agreement signed |
| Kettleman Solar Project (Fka Kettleman Solar Farm) Solar + storage |
40.0 MW | Agreement signed |
| Little Bear Solar 1 Solar + storage |
40.0 MW | Agreement signed |
| Little Bear Solar 2 Solar + storage |
40.0 MW | Agreement signed |
| Rio Bravo Solar 2 Solar + storage |
40.0 MW | Agreement signed |
| Pumpjack Solar I (Aka Pioneer Solar I) Solar + storage |
40.0 MW | Agreement signed |
| Crow Creek Solar 1 (Fka: Frontier Solar 1) (Fka As Scatec Westside Solar Ranch I And Stanislaus PV - Phase 1) Solar + storage |
40.0 MW | Agreement signed |
| Starlight Solar Solar + storage |
37.4 MW | Agreement signed |
| Escondido Energy Center 2 Battery storage |
33.0 MW | Agreement signed |
| Dynamo Solar Solar |
24.5 MW | Agreement signed |
| Lake Alpaugh Battery Storage Battery storage |
10.0 MW | Agreement signed |
| Altamont Midway LTD Onshore wind |
5.0 MW | Agreement signed |
| Lassen Lodge Hydroelectric Hydro |
4.5 MW | Agreement signed |
| Lassen Lodge Hydroelectric 2 Hydro |
0.5 MW | Agreement signed |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)578 · 119.3 GW
- CAISO (California)235 · 96.2 GW
- West (non-ISO utilities)349 · 60.6 GW
- Southeast (non-ISO utilities)192 · 37.8 GW
- SPP (Southwest Power Pool)212 · 37.6 GW
- PJM (Mid-Atlantic, Midwest)343 · 35.0 GW
- MISO (Midcontinent)187 · 28.1 GW
- ISO-NE (New England)45 · 8,609 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)