Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Battery storage project GEN-2023-SR25, Mayes County Battery storage |
72.5 MW | In study |
| Battery storage project GEN-2023-SR26, Mayes County Battery storage |
72.5 MW | In study |
| Battery storage project GEN-2024-SR13, Bryan County Battery storage |
52.2 MW | In study |
| Battery storage project GEN-2024-SR17, Kay County Battery storage |
50.0 MW | In study |
| Onshore wind project GEN-2026-PR3, Garfield County Onshore wind |
49.7 MW | In study |
| Solar + storage project GEN-2024-052, Choctaw County Solar + storage |
42.0 MW | In study |
| Onshore wind project GEN-2026-PR2, Dewey County Onshore wind |
41.9 MW | In study |
| Battery storage project GEN-2017-117, Canadian County Battery storage |
19.8 MW | Paused / redesign |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)