United States › Grid › Interconnection queues › Delaware

OCTARY USA · INTERCONNECTION QUEUES

Withdrawn queue requests in Delaware — page 3

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown10317.6 GW
Active in queue874 MW16 requests
Agreement signed50.0 MW3 requests
Withdrawn10317.6 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

103 requests · page 3 of 3
ProjectCapacityStatusLocationRegionQueuedOnline
TES Blue Hen Solar 23
Solar
1.5 MWWithdrawn / abandoned Kent, DEPJM Jul 2020target 2021
Other project N44, Kent County
Other
1.0 MWWithdrawn / abandoned Kent, DEPJM Jan 2005target 2005
UD Motor Pool
Battery storage
0.8 MWWithdrawn / abandoned New Castle, DEPJM Feb 2018target 2022
Page 3 of 3

Capacity in the queue by state

Click a state to drill down.

By grid region

ISO/RTO markets and the non-ISO West and Southeast.

Requests by year joined

Capacity of requests in this view, by the year they entered the queue. Click a year.

20102025

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)