TES Blue Hen Solar 23

TES Blue Hen Solar 23 is a 1.5 MW solar request withdrawn in the PJM interconnection queue, in Kent County, Delaware, connecting to DPL.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2020 (completed)
  2. Withdrawn / abandonedAug 2021 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AG1-079
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
DPL
Connection point (POI)
New Meredith 69 kV
Location
Kent County, Delaware
Technology
Solar: 1.5 MW
Total requested
1.5 MW
Service type
Energy only (ERIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Wholesale Market P
Queue status
Withdrawn
Entered queue
31 July 2020
Proposed online date
November 2021
Withdrawn
August 2021

Location

Marker shows the centre of Kent County; the queue data does not give exact sites.

Power plants in Delaware Β· Transmission lines in Delaware

Other requests in Kent County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem