πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί South Carolina

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in South Carolina (2025 requests) β€” page 2

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown657,497 MW
Active in queue7,497 MW65 requests
Agreement signed0.0 MW0 requests
Withdrawn102,207 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

65 requests Β· page 2 of 2
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project 977885, Greenwood County
Solar
19.9 MWIn study Greenwood, SCSoutheast Jun 2025
Solar project 977884, Chester County
Solar
19.9 MWIn study Chester, SCSoutheast Jun 2025
Solar project 968547, Marlboro County
Solar
10.0 MWIn study Marlboro, SCSoutheast Jan 2025
Solar project 977121, Williamsburg County
Solar
6.0 MWIn study Williamsburg, SCSoutheast Jun 2025
Solar project 977876, Williamsburg County
Solar
5.0 MWIn study Williamsburg, SCSoutheast Jun 2025
Solar project 977864, Florence County
Solar
5.0 MWIn study Florence, SCSoutheast Jun 2025
Solar project 977879, Florence County
Solar
5.0 MWIn study Florence, SCSoutheast Jun 2025
Solar project 968459, Darlington County
Solar
5.0 MWIn study Darlington, SCSoutheast Jan 2025
Solar project 968543, Dillon County
Solar
4.0 MWIn study Dillon, SCSoutheast Jan 2025
Solar project 977878, Marion County
Solar
3.2 MWIn study Marion, SCSoutheast Jun 2025
Solar project 968482, Anderson County
Solar
3.0 MWIn study Anderson, SCSoutheast Jan 2025
Solar project 972410, Anderson County
Solar
2.5 MWIn study Anderson, SCSoutheast Mar 2025
Solar project 966893, Spartanburg County
Solar
2.5 MWIn study Spartanburg, SCSoutheast Jan 2025
Solar project 968499, Greenwood County
Solar
2.0 MWIn study Greenwood, SCSoutheast Jan 2025
Solar project 977127, Anderson County
Solar
1.5 MWIn study Anderson, SCSoutheast Jun 2025
Page 2 of 2

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)