United States › Grid › Interconnection queues › South Carolina
SOLAR · SOUTHEASTSolar project 977884, Chester County
Solar project 977884, Chester County is a 19.9 MW solar request in interconnection study in the Southeast interconnection queue, in Chester County, South Carolina, connecting to Duke Energy Carolinas.
- PlanningQueued Jun 2025 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- Operating (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 977884
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Carolinas
- Connection point (POI)
- Landsford WH 100 kV
- Location
- Chester County, South Carolina
- Technology
- Solar: 19.9 MW
- Total requested
- 19.9 MW
- Service type
- Other
- Study phase
- Phase 1 Cluster Study - Study Complete
- Queue status
- Active
- Entered queue
- 30 June 2025
Location
Marker shows the centre of Chester County; the queue data does not give exact sites.
Power plants in South Carolina · Transmission lines in South Carolina
Other requests in Chester County
- Solar project 48968, Chester CountySolar · 69.8 MW · agreement signed
- Gas project 288, Chester CountyGas · 55.6 MW · in study
- Gas project 290, Chester CountyGas · 55.6 MW · in study
- Gas project 291, Chester CountyGas · 55.6 MW · in study
- Gas project 289, Chester CountyGas · 55.6 MW · in study
- Solar project 66052, Chester CountySolar · 74.5 MW · withdrawn
- Solar project 963467, Chester CountySolar · 68.0 MW · withdrawn
- Solar project 920667, Chester CountySolar · 64.0 MW · withdrawn
- Solar project 920197, Chester CountySolar · 44.0 MW · withdrawn
- Solar project 962805, Chester CountySolar · 44.0 MW · withdrawn
- Solar project 16298, Chester CountySolar · 39.0 MW · withdrawn
- Solar project 918031, Chester CountySolar · 30.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem