United States › Grid › Interconnection queues › South Carolina
GAS · SOUTHEASTGas project 291, Chester County
Gas project 291, Chester County is a 55.6 MW gas request in interconnection study in the Southeast interconnection queue, in Chester County, South Carolina, connecting to Santee Cooper.
- PlanningQueued May 2025 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2030 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 291
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Santee Cooper
- Location
- Chester County, South Carolina
- Technology
- Gas: 55.6 MW
- Total requested
- 55.6 MW
- Service type
- Network resource (NRIS)
- Study phase
- 2025 Cluster
- Queue status
- Active
- Entered queue
- 19 May 2025
- Proposed online date
- December 2030
Location
Marker shows the centre of Chester County; the queue data does not give exact sites.
Power plants in South Carolina · Transmission lines in South Carolina
Other requests in Chester County
- Solar project 48968, Chester CountySolar · 69.8 MW · agreement signed
- Gas project 288, Chester CountyGas · 55.6 MW · in study
- Gas project 290, Chester CountyGas · 55.6 MW · in study
- Gas project 289, Chester CountyGas · 55.6 MW · in study
- Solar project 977884, Chester CountySolar · 19.9 MW · in study
- Solar project 66052, Chester CountySolar · 74.5 MW · withdrawn
- Solar project 963467, Chester CountySolar · 68.0 MW · withdrawn
- Solar project 920667, Chester CountySolar · 64.0 MW · withdrawn
- Solar project 920197, Chester CountySolar · 44.0 MW · withdrawn
- Solar project 962805, Chester CountySolar · 44.0 MW · withdrawn
- Solar project 16298, Chester CountySolar · 39.0 MW · withdrawn
- Solar project 918031, Chester CountySolar · 30.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem