United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESInterconnection queue in West (non-ISO utilities) (2017 requests) β page 2
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar + storage project 862, Box Elder County Solar + storage Β· Rocket Solar, LLC |
45.0 MW | Paused / redesign |
| Geothermal project Company HU, Churchill County Geothermal |
38.5 MW | Agreement signed |
| Solar project GI-2017-52, El Paso County Solar |
36.0 MW | Agreement signed |
| Solar project G0570, Lake County Solar |
20.0 MW | In study |
| Solar project G0571, Lake County Solar |
20.0 MW | In study |
| Solar project G0572, Lake County Solar |
20.0 MW | In study |
| Solar project SGI-PNM-2017-08, Luna County Solar |
11.0 MW | Agreement signed |
| Solar project IA-PNM-2017-01, Cibola County Solar Β· NextEra Energy |
10.0 MW | Agreement signed |
| Solar project SGI-PNM-2017-09, Luna County Solar |
8.3 MW | Agreement signed |
| Hydro project 973, Franklin County Hydro Β· City of Preston |
0.4 MW | Agreement signed |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- SPP (Southwest Power Pool)66 Β· 11.8 GW
- West (non-ISO utilities)60 Β· 10.4 GW
- CAISO (California)17 Β· 8,678 MW
- ERCOT (Texas)36 Β· 5,724 MW
- MISO (Midcontinent)32 Β· 5,609 MW
- PJM (Mid-Atlantic, Midwest)44 Β· 4,774 MW
- Southeast (non-ISO utilities)28 Β· 2,517 MW
- ISO-NE (New England)3 Β· 831 MW
- NYISO (New York)6 Β· 749 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)