United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESInterconnection queue in Southeast (non-ISO utilities) (2021 requests) β page 2
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar + storage project JEA-Q009, Duval County Solar + storage |
74.9 MW | In study |
| Solar + storage project 425, Bradford County Solar + storage Β· Third Party |
74.9 MW | Agreement signed |
| Solar project 293, Alachua County Solar Β· Pleasant Solar, LLC |
74.9 MW | Paused / redesign |
| Solar project 424D, Madison County Solar Β· FPL |
74.5 MW | In study |
| Solar project 424A, Leon County Solar Β· FPL |
74.5 MW | In study |
| Solar project 424B, Leon County Solar Β· FPL |
74.5 MW | In study |
| Solar project 424, Manatee County Solar Β· FPL |
74.5 MW | In study |
| Solar + storage project IC-955, Lowndes County Solar + storage |
58.0 MW | Paused / redesign |
| Solar project 165, Georgetown County Solar |
50.0 MW | Under construction |
| Battery storage project 186466, Gaston County Battery storage |
50.0 MW | Under construction |
| Battery storage project 191894, Buncombe County Battery storage Β· Duke Energy Progress, LLC |
30.5 MW | Under construction |
| Hydro project 476, Lyon County Hydro |
18.0 MW | In study |
| Nuclear project 471, Hamilton County Nuclear |
6.0 MW | Agreement signed |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)228 Β· 68.8 GW
- CAISO (California)138 Β· 66.9 GW
- ERCOT (Texas)207 Β· 39.5 GW
- MISO (Midcontinent)136 Β· 23.7 GW
- Southeast (non-ISO utilities)63 Β· 12.7 GW
- SPP (Southwest Power Pool)44 Β· 9,029 MW
- ISO-NE (New England)20 Β· 3,998 MW
- PJM (Mid-Atlantic, Midwest)49 Β· 2,072 MW
- NYISO (New York)11 Β· 991 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)