OCTARY USA · INTERCONNECTION QUEUES

Queue projects under construction in Southeast (non-ISO utilities) — page 2

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown605,029 MW
Active in queue161.4 GW1,067 requests
Agreement signed37.8 GW192 requests
Withdrawn2,738603.3 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

60 requests · page 2 of 2
ProjectCapacityStatusLocationRegionQueuedOnline
Other project 897773, Johnston County
Other
10.0 MWUnder construction Johnston, NCSoutheast Jun 2023target 2026
Hydro project 570430, Montgomery County
Hydro · Duke Energy Progress, LLC
6.3 MWUnder construction Montgomery, NCSoutheast Jun 2022target 2025
Hydro project 899433, Montgomery County
Hydro · Duke Energy Progress, LLC
6.3 MWUnder construction Montgomery, NCSoutheast Jun 2023
Battery storage project 561350, Fairfield County
Battery storage
4.6 MWUnder construction Fairfield, SCSoutheast Jun 2022target 2025
Battery storage project 889853, Vance County
Battery storage
3.6 MWUnder construction Vance, NCSoutheast Jun 2023
Other project 894253, Cleveland County
Other
2.8 MWUnder construction Cleveland, NCSoutheast Jan 2000
Battery storage project 563202, Burke County
Battery storage
2.7 MWUnder construction Burke, NCSoutheast Jun 2022target 2026
Other project 897777, Wake County
Other
2.0 MWUnder construction Wake, NCSoutheast Jun 2023target 2025
Hydro project 897387, Macon County
Hydro
2.0 MWUnder construction Macon, NCSoutheast Jun 2023
Solar project 21892, Marion County
Solar
2.0 MWUnder construction Marion, SCSoutheast Jul 2018target 2025
Page 2 of 2

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)