Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown905105.4 GW
Active in queue140.4 GW1,248 requests
Agreement signed35.0 GW343 requests
Withdrawn5,226638.1 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

905 requests · page 19 of 19
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project AH2-054, Wicomico County
Solar
2.0 MWIn study Wicomico, MDPJM Dec 2021target 2022
Solar project AH2-065, Prince George's County
Solar
2.0 MWIn study Prince George's, MDPJM Dec 2021target 2022
Solar project AH2-109
Solar
1.5 MWIn study NJPJM Feb 2022target 2022
Solar project AI1-160, Crawford County
Solar
1.4 MWIn study Crawford, PAPJM Sep 2022target 2028
Solar project AH2-055
Solar
1.0 MWIn study MDPJM Dec 2021target 2022
Page 19 of 19

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)