United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in Texas (2024 requests) β€” page 10

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown452109.5 GW
Active in queue109.5 GW452 requests
Agreement signed17.3 GW74 requests
Withdrawn429,552 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

452 requests Β· page 10 of 10
ProjectCapacityStatusLocationRegionQueuedOnline
Abilene Industrial Park BESS
Battery storage Β· Distributed Generation Solutions LLC
9.9 MWAgreement signed Taylor, TXERCOT Sep 2024target 2026
Cedarvale Gas
Gas Β· RPC Merchant LLC
9.9 MWAgreement signed Ward, TXERCOT Oct 2024target 2026
Page 10 of 10

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)