SOLAR Β· OPERATIONAL

Stokeford

Stokeford is a 28.5 MW solar farm in South West England, operated by Greencoat Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • South West
  • England
Project stageOperating
  1. PlanningAug 2015 (completed)
  2. ConsentedOct 2015 (completed)
  3. ConstructionOct 2023 (completed)
  4. OperatingJul 2024 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
28.5 MW
Status
Operational
Technology
Solar Β· PV
Operator
Greencoat Capital
Region
South West
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
BH20 6AN

Location

No coordinates are published for this station.

How Stokeford compares

30th of 662largest solar farms in the UK register
4th of 192in South West
0.51%of listed UK solar farms capacity
β‰ˆ 25 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 28.5 MW station would generate roughly 25 GWh of electricity in a year, similar to the annual use of about 9,250 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in South West All run by Greencoat Capital

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Stokeford Farm
Developer / operator
Alaska (The Holme Estate)
Planning authority
Dorset
Planning reference
6/2015/0516
Application submitted
19 August 2015
Permission granted
28 October 2015
Construction started
1 October 2023
Began operating
31 July 2024
Capacity in planning record
28.5 MW
Address
Stokeford Farm (Land at), East Stoke, Wareham, Dorset, BH20 6AN
REPD reference
5659

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.