Mount Farm
Mount Farm is a 23.1 MW solar farm in West Midlands England, operated by Greencoat Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- West Midlands
- England
Key facts
- Installed capacity
- 23.1 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Greencoat Capital
- Region
- West Midlands
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- WR12 7JA
- Coordinates
- 52.0554, -1.9371
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Mount Farm compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 23.1 MW station would generate roughly 20 GWh of electricity in a year, similar to the annual use of about 7,490 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in West Midlands All run by Greencoat CapitalNearby generating sites
- Five Mile Drive Β· 3.91 MW solar farm10.0 km
- Springhill Β· 4.95 MW solar farm10.1 km
- Salford Lodge Solar Farm Β· 5 MW solar farm11.3 km
- Robert's Wall Β· 2.56 MW solar farm11.3 km
- Defford Β· 50 MW solar farm14.6 km
- Home Farm Β· 4.99 MW solar farm17.1 km
- The Beeches Β· 5 MW solar farm17.6 km
- Brookside Β· 5 MW solar farm17.6 km
Also operated by Greencoat Capital
Greencoat Capital operates 195 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Developer / operator
- INRG (Solar Park) 14
- Planning authority
- Wychavon
- Planning reference
- 14/01029
- Application submitted
- 13 May 2014
- Permission granted
- 6 July 2015
- Construction started
- 15 January 2016
- Began operating
- 23 March 2016
- Capacity in planning record
- 22 MW
- Address
- Land off Longdon Hill, Wickhamford, Hereford and Worcester
- REPD reference
- 2175
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.