Elms

Elms is a 27.8 MW solar farm in West Midlands England, operated by Greencoat Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • West Midlands
  • England

Key facts

Installed capacity
27.8 MW
Status
Operational
Technology
Solar Β· PV
Operator
Greencoat Capital
Region
West Midlands
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
CV35 9DP

Location

No coordinates are published for this station.

How Elms compares

33rd of 662largest solar farms in the UK register
3rd of 44in West Midlands
0.49%of listed UK solar farms capacity
β‰ˆ 24 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 27.8 MW station would generate roughly 24 GWh of electricity in a year, similar to the annual use of about 9,010 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in West Midlands All run by Greencoat Capital

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Elms Farm
Developer / operator
Bluefield Solar
Planning authority
Vale of White Horse
Planning reference
P14/V1135/FUL
Application submitted
28 May 2014
Permission granted
28 August 2014
Construction started
1 December 2014
Began operating
16 March 2015
Capacity in planning record
29 MW
Address
Elms Farm Grove, Oxfordshire
REPD reference
1832

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026