Drax operates four 645 MW biomass units: 2,580 MW of rated generating capacity. The former coal units closed in March 2023. The generating station, EGL2 transmission converter and proposed data centre are separate assets; their ratings must not be treated as one combined output.
Drax Group
OpenStreetMap view showing the actual atlas coordinate for Drax Biomass Power Station, with a wider local view and a closer site-focused view.
This view places the station in its surrounding district, coast or industrial corridor.
This tighter map makes the specific site position much clearer for the station record.

This summary focuses on the key facts that explain the stationβs role in the wider UK generation system.
These timeline entries highlight the main milestones for the site, including commissioning, major changes, closure and current status where relevant.
The first full-unit biomass conversion began the current generation phase.
The fourth biomass conversion expanded the converted fleet.
The remaining coal units closed in March; biomass generation continued.
Draxβs generating station, the EGL2 converter and PeterheadβDrax cable, and the proposed AI data centre are different assets with separate capacity definitions and development stages.
Power-station siting reflects engineering requirements, fuel and water logistics, grid access, industrial geography and the planning frameworks of the period in which the site was developed. Drax Biomass Power Station should therefore be read as part of a wider infrastructure system rather than as an isolated structure in the landscape.
Project facts reviewed 2026-10-08
These notes highlight the main structures, layout characteristics and historic changes associated with the station. They are intended as a concise interpretive layer alongside the reference data, timeline and technical diagrams.
Wood-pellet handling and converted boilers supply steam turbines and the grid connection.
The operating biomass units coexist with transmission investment and proposed future developments.
This record can be expanded further with licensed site plans, archival photography, demolition or redevelopment updates, fuller unit-level timelines and linked planning or environmental documentation.