Grid infrastructure › Connection queue › Solar + storage
SOLAR + STORAGE · SPTClyde South Energy Park
Clyde South Energy Park is a 120 MW solar + storage project in planning, connecting to the SP Transmission (south Scotland) network at Redshaw 132kV Substation., with capacity due from October 2037. The connection agreement is held by Renewco Power Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2037 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-006096
- Customer
- Renewco Power Limited
- Technology
- Energy Storage System, PV Array (Photo Voltaic/solar), Wind Onshore
- Total capacity
- 120 MW
- Change in this agreement
- +120 MW
- Capacity effective from
- 31 October 2037
- Connection site
- Redshaw 132kV Substation.
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
- Connections reform gate
- Gate 1
Connection site
The connection site could not be placed on the map.
Other projects at Redshaw 132kV Substation.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem