Grid infrastructure › Connection queue › Solar + storage

SOLAR + STORAGE · SPT

Clyde South Energy Park

Clyde South Energy Park is a 120 MW solar + storage project in planning, connecting to the SP Transmission (south Scotland) network at Redshaw 132kV Substation., with capacity due from October 2037. The connection agreement is held by Renewco Power Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2037 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-006096
Customer
Renewco Power Limited
Technology
Energy Storage System, PV Array (Photo Voltaic/solar), Wind Onshore
Total capacity
120 MW
Change in this agreement
+120 MW
Capacity effective from
31 October 2037
Connection site
Redshaw 132kV Substation.
Transmission owner
SP Transmission (south Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Scoping
Connections reform gate
Gate 1

Connection site

The connection site could not be placed on the map.

Projects connecting near Redshaw · Grid map

Other projects at Redshaw 132kV Substation.

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem