Grid infrastructure › Connection queue › Battery storage

BATTERY STORAGE · NGET

Brentford (SSEN-FBT624) -120MW BESS

Brentford (SSEN-FBT624) -120MW BESS is a 120 MW battery storage project in planning, connecting to the National Grid (England & Wales) network at West London Connection Node B 132kV substation, with capacity due from October 2038. The connection agreement is held by Lightsource Renewable UK Development Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2038 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-006042
Customer
Lightsource Renewable UK Development Limited
Technology
Energy Storage System
Total capacity
120 MW
Change in this agreement
+120 MW
Capacity effective from
31 October 2038
Connection site
West London Connection Node B 132kV substation
Transmission owner
National Grid (England & Wales)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Scoping
Connections reform gate
Gate 1

Connection site

This project connects at a new substation (a “connection node”) that has not been built or located yet.

Projects connecting near West London Connection Node B · Grid map

Other projects at West London Connection Node B 132kV substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem