Grid infrastructure › Connection queue › Solar + storage

SOLAR + STORAGE · NGET

Lincolnshire Energy Park

Lincolnshire Energy Park is a 500 MW solar + storage project in planning, connecting to the National Grid (England & Wales) network at South Humber Connection Node A 400kV, with capacity due from October 2039. The connection agreement is held by Wind 2 Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2039 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-006033
Customer
Wind 2 Limited
Technology
Energy Storage System, PV Array (Photo Voltaic/solar), Reactive Compensation, Wind Onshore
Total capacity
500 MW
Change in this agreement
+500 MW
Capacity effective from
30 October 2039
Connection site
South Humber Connection Node A 400kV
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Scoping

Connection site

This project connects at a new substation (a “connection node”) that has not been built or located yet.

Projects connecting near South Humber Connection Node A · Grid map

Other projects at South Humber Connection Node A 400kV

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem