Grid infrastructure βΊ Connection queue βΊ Solar + storage
SOLAR + STORAGE Β· SPTGalileo 16
Galileo 16 is a 125 MW solar + storage project in planning, connecting to the SP Transmission (south Scotland) network at Galileo 16 132kV Substation, with capacity due from October 2032. The connection agreement is held by Galileo 16 Limited.
Project stageIn planning
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2032 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-005117
- Customer
- Galileo 16 Limited
- Technology
- Energy Storage System, PV Array (Photo Voltaic/solar), Wind Onshore
- Total capacity
- 125 MW
- Change in this agreement
- +125 MW
- Capacity effective from
- 29 October 2032
- Connection site
- Galileo 16 132kV Substation
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
- Connections reform gate
- Gate 1
Connection site
The connection site could not be placed on the map.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem