Grid infrastructure › Connection queue › Solar + storage

SOLAR + STORAGE · NGET

Saver & Pashley Farm Energy Park

Saver & Pashley Farm Energy Park is a 130 MW solar + storage project in planning, connecting to the National Grid (England & Wales) network at Ninfield GSP, with capacity due from December 2036. The connection agreement is held by Elgin Energy Es Co Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Dec 2036 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-004789
Customer
Elgin Energy Es Co Limited
Technology
Energy Storage System, PV Array (Photo Voltaic/solar)
Total capacity
130 MW
Change in this agreement
+130 MW
Capacity effective from
6 December 2036
Connection site
Ninfield GSP
Transmission owner
National Grid (England & Wales)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Scoping

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Ninfield GSP · Grid map

Other projects at Ninfield GSP

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem