Grid infrastructure β€Ί Connection queue β€Ί Solar

SOLAR Β· NGET

West Grimsby Farm

West Grimsby Farm is a 150 MW solar project in planning, connecting to the National Grid (England & Wales) network at Grimsby West 132kV Substation, with capacity due from October 2035. The connection agreement is held by Elgin Energy Es Co Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2035 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-004434
Customer
Elgin Energy Es Co Limited
Technology
PV Array (Photo Voltaic/solar)
Total capacity
150 MW
Change in this agreement
+150 MW
Capacity effective from
31 October 2035
Connection site
Grimsby West 132kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Awaiting Consents
Connections reform gate
Gate 1

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Grimsby West Β· Grid map

Other projects at Grimsby West 132kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem